免费无遮挡又黄又爽网站无码国产_日韩美女在线成人毛片视频_性欧美日本视频一区在线播放_日韩成人午夜福利免费在线观看_欧洲精品视频无码_一女三男做2爱A片._五月六月婷婷中文字幕在线_观看最新热门影片_国产妇女视频三级99色图_精品人妻伦一二二区久久

免费无遮挡又黄又爽网站无码国产_日韩美女在线成人毛片视频_性欧美日本视频一区在线播放_日韩成人午夜福利免费在线观看_欧洲精品视频无码_一女三男做2爱A片._五月六月婷婷中文字幕在线_观看最新热门影片_国产妇女视频三级99色图_精品人妻伦一二二区久久

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類(lèi)
聯(lián)系我們
濟南航豐實(shí)業(yè)有限公司

電話(huà):15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://yxsdz.cn  

廠(chǎng)址: 德州市禹城市莒鎮產(chǎn)業(yè)園26棟

經(jīng)銷(xiāo)商地址:天橋區建華五金市場(chǎng)東區5-1  

魯ICP備09095923號-1

新聞資訊

當前位置:首頁(yè) / 新聞資訊

濟南電纜橋架穿墻安裝要點(diǎn)有哪些

  說(shuō)起濟南電纜橋架,很多人應該很熟悉,電纜橋在我們的生活中是很廣泛的使用。你知道電纜橋架穿墻的關(guān)鍵點(diǎn)是什么嗎?安裝的注意事項是什么?帶你去了解,希望對你有所幫助!
  Speaking of Jinan cable bridge, many people should be familiar with it. Cable bridge is widely used in our life. Do you know what is the key point of cable bridge passing through the wall? What are the installation precautions? Take you to understand, hope to help you!
  1. 電纜橋架從所有正常的自然環(huán)境穿過(guò)墻體進(jìn)入防火、防爆型的自然環(huán)境,墻體應安裝相應的密封設備。
  1. The cable tray passes through the wall from all normal natural environment to enter the fire-proof and explosion-proof natural environment, and the wall shall be installed with corresponding sealing equipment.
  2. 當電纜橋架從房間穿墻進(jìn)入室外時(shí),墻體兩側應采取防水防雨措施。
濟南電纜橋架
  2. When the cable bridge enters the outdoor from the room through the wall, waterproof and rainproof measures shall be taken on both sides of the wall.
  3.當電纜橋架從房間內的墻壁安裝到室外較高的高度時(shí),電纜橋架應傾斜增加適當的距離,然后再進(jìn)行搭接,以滿(mǎn)足安裝標準。此外,應避免沉淀,將電纜橋架注入室內。
  3. When the cable tray is installed from the wall in the room to a higher outdoor height, the cable tray shall be inclined to increase the appropriate distance, and then the lap joint shall be carried out to meet the installation standard. In addition, precipitation shall be avoided and cable trays shall be injected into the room.
  4. 當電纜橋架通過(guò)伸縮變形節時(shí),電纜橋架應折斷。電纜之間的間距應為100毫米
  4. When the cable bridge passes through the expansion deformation joint, the cable bridge shall be broken. The distance between cables shall be 100 mm
  設備關(guān)鍵點(diǎn)和常見(jiàn)問(wèn)題
  Equipment key points and FAQs
  1.有線(xiàn)電視柜設備除了需要屏蔽安裝盾,為有線(xiàn)電視柜安裝在室外環(huán)境,應該改裝罩頂部,避免太陽(yáng),因為如果你想安裝焊接時(shí),焊接,焊接厚不低于周?chē)膶雍缚p焊接部分,焊縫腐蝕的解決方案。
  1. In addition to shield installation shield, cable cabinet equipment shall be installed in outdoor environment. The top of cover shall be modified to avoid sun, because if you want to install and weld, the welding thickness shall not be less than the surrounding butt weld welding part and the solution of weld corrosion.
  2.裝配橋系列產(chǎn)品電纜橋架設備的大載荷支撐點(diǎn)間距應小于允許載荷和支撐點(diǎn)間距。
  2. The distance between large load supporting points of cable bridge equipment for assembling bridge series products shall be less than the allowable load and the distance between supporting points.
  3.在選擇電纜橋架總寬度時(shí),應預留一定的預留位置,方便日后加纜
  3. When selecting the total width of cable bridge, a certain reserved position shall be reserved for the convenience of adding cables in the future
  4.當電線(xiàn)電纜與變頻電纜較少時(shí),可安裝在同一電纜橋架上,但中間應將電線(xiàn)電纜與變頻電纜分開(kāi)敷設。
  4. When there are less wires and cables and frequency conversion cables, they can be installed on the same cable bridge, but the wires and cables shall be laid separately from frequency conversion cables in the middle.
  5.電纜橋架水平敷設時(shí),電纜橋架中間的連接頭應盡量設置在跨的上、下1/4處。水平電纜每隔兩米固定在跨度的上、下部分,垂直電纜每隔1.5米固定在跨度的上、下部分。
  5. When the cable tray is laid horizontally, the connector in the middle of the cable tray shall be set at the upper and lower 1 / 4 of the span as far as possible. The horizontal cable is fixed at the upper and lower parts of the span every two meters, and the vertical cable is fixed at the upper and lower parts of the span every 1.5 meters.
  6.電纜橋架設備應有可靠的接地裝置。若以橋架為主接地線(xiàn),每層橋架頂部應接16mm2軟銅芯線(xiàn)(系列),并與主接地線(xiàn)通信,長(cháng)途電纜橋架每隔30—50米設接地裝置。
  6. The cable bridge equipment shall have reliable grounding device. If the cable tray is the main ground wire, 16mm2 soft copper core wire (Series) shall be connected at the top of each layer of cable tray and communicate with the main ground wire. The grounding device shall be set every 30-50m for long-distance cable tray.
  以上是濟南電纜橋架穿墻的要點(diǎn)及安裝要點(diǎn)注意事項,相信通過(guò)這篇文章的介紹,你可以對這座橋有一定的了解和了解,希望以上內容能對你有所幫助。另外,如果你想了解更多相關(guān)信息,可以多關(guān)注我們的網(wǎng)站動(dòng)態(tài)!
  The above is the key points of Jinan cable bridge through the wall and installation points. I believe that through the introduction of this article, you can have a certain understanding of this bridge, and hope that the above content can help you. In addition, if you want to know more about it, you can pay more attention to our website!
 
qq
售前咨詢(xún)熱線(xiàn)
15168870138
售后咨詢(xún)熱線(xiàn)
13465410318