電纜橋架的防火設計你了解多少?
1. 當橋架高度為50和100時(shí),兩端各有6個(gè)連接孔;當橋架高度為150和200時(shí),兩端各有12個(gè)連接孔。
1. When the bridge height is 50 and 100, there are 6 connection holes at both ends; when the bridge height is 150 and 200, there are 12 connection holes at both ends.
2. 分開(kāi)敷設:當電源線(xiàn)、控制線(xiàn)較少時(shí),可安裝在同一電纜橋上,但電源線(xiàn)、控制線(xiàn)應在中間隔墻分開(kāi)敷設。
2. Separate laying: when the power line and control line are less, they can be installed on the same cable bridge, but the power line and control line should be laid separately in the middle partition wall.
3.橋寬:在選擇電纜橋寬時(shí),應留出一定的空間供將來(lái)使用。
3. Bridge width: when selecting cable bridge width, certain space shall be reserved for future use.
4. 電纜固定:當橋梁水平敷設時(shí),橋梁框架間的連接應盡量設置在跨度的1/4處。水平電纜每2米左右固定一次,垂直電纜每1.5米左右固定一次。
4. Cable fixation: when the bridge is laid horizontally, the connection between bridge frames shall be set at 1 / 4 of the span as far as possible. The horizontal cable is fixed once every 2 meters or so, and the vertical cable is fixed once every 1.5 meters or so.
5. 支撐間距:支撐間距應小于或等于荷載曲線(xiàn)的允許荷載和支撐間距。
5. support spacing: the support spacing shall be less than or equal to the allowable load and support spacing of the load curve.
以上是濟南電纜橋架制造商為大家介紹的相關(guān)內容,想要了解更多內容,歡迎訪(fǎng)問(wèn)網(wǎng)站:http://yxsdz.cnThe above is the relevant content introduced by Jinan cable tray manufacturer. For more information, please visit the website: http://yxsdz.cn