鋁合金電纜橋架的吊裝注意事項
鋁合金橋架,許多朋友都不會(huì )覺(jué)得陌生,是在橋架中應用非常的廣泛。但是在安裝時(shí)稍不注意,就會(huì )造成一些不必要的損失的。下面就由山東電纜橋架告訴大家鋁合金橋架在吊裝時(shí)需要注意的事項。
Aluminum alloy bridge, many friends will not feel strange, is widely used in the bridge. But if you don't pay attention to the installation, it will cause some unnecessary losses. Next, the Shandong Cable Bridge Frame tells you the matters needing attention in the hoisting of aluminium alloy bridge.
一、留意運用環(huán)境
1. Pay attention to the application environment
要留意運用環(huán)境是怎么樣的,如果不留意運用環(huán)境,那么其運用作用也是會(huì )遭到很大的影響的。這主要是因為鋁合金橋架主要是以銅 、硅、鎂等為主要原料的。其密度相對來(lái)說(shuō)比較低,可是強度是比較好的。并且因為其具有很好的導電性以及導熱性,因此也是被加工成各種型材,在工業(yè)上也被廣泛的運用。
We should pay attention to the use of the environment, if we do not pay attention to the use of the environment, then its use will be greatly affected. This is mainly because the main raw materials of aluminium alloy bridge are copper, silicon and magnesium. Its density is relatively low, but its strength is relatively good. And because of its good conductivity and thermal conductivity, it is also processed into various profiles, which is also widely used in industry.
二、留意材質(zhì)
2. Pay attention to material quality
鋁合金橋架也是分為兩大類(lèi)的,一種為鑄造鋁合金,另一種為變形鋁合金。因為變形鋁合金承受壓力能力比較強,那么在加工時(shí),也是可以加工成各種形狀的鋁合金橋架的。那么根據其功能,也是可以對其進(jìn)行更好的運用的。
Aluminum alloy bridge is also divided into two categories, one is cast aluminium alloy, the other is deformed aluminium alloy. Because the deformed aluminium alloy has a strong ability to withstand pressure, it can also be processed into various shapes of aluminium alloy bridge during processing. Then according to its function, it can be better used.
三、留意
3. Pay attention to safety
鋁合金橋架在進(jìn)行吊裝的時(shí)分,也是要留意一下其鋼結構是怎么樣的,一般來(lái)說(shuō),鋼結構也是分為工字鋼、角鋼以及輕鋼龍骨等多個(gè)結構的。那么在進(jìn)行裝置的時(shí)分,就可以將這些吊具以及卡具、吊桿等進(jìn)行一個(gè)很好的拼裝,在拼裝完結以后,就可以標出固定點(diǎn)了,然后再進(jìn)行吊裝,這對于愈加的吊裝也是有著(zhù)非常重要的作用的。這里小編想要特別提示我們的就是,在進(jìn)行吊裝的時(shí)分,也是需求留意將吊裝卡具壓接在鋼結構上的,這樣一來(lái),才能更具有性。
Aluminum alloy bridge in the hoisting time, but also to pay attention to its steel structure is how, generally speaking, steel structure is also divided into I-beam, angle steel and light steel keel and other structures. Then in the process of installation, we can assemble these hangers, clamps, suspenders and so on very well. After assembly, we can mark the fixed point, and then carry out hoisting, which is also very important for safer hoisting. Here is a special reminder of the small edition, when lifting, but also need to pay attention to the lifting clamp pressure on the steel structure, so as to have more security.
四、留意步驟
IV. Pay attention to the steps
一般來(lái)說(shuō),鋁合金橋架在進(jìn)行裝置的時(shí)分,也是需求留意一定的裝置步驟的,比如說(shuō),在進(jìn)行直線(xiàn)段拼裝的時(shí)分,就需求先做好一些干線(xiàn),然后再做分支線(xiàn),同時(shí),在進(jìn)行彎頭裝置的時(shí)分,也是需求留意裝置視點(diǎn)的問(wèn)題的。
Generally speaking, when aluminium alloy bridge is installed, it is also necessary to pay attention to certain installation steps. For example, when assembling straight line segments, it is necessary to do some trunk lines first, then branch lines. At the same time, when carrying out elbow devices, it is also necessary to pay attention to the problem of device viewpoint.
以上的精彩內容由山東電纜橋架友情提供,更多精彩內容請收藏我們的官網(wǎng):http://yxsdz.cn
The above wonderful content is provided by the friendship of Shandong Cable Bridge Frame. For more wonderful content, please collect our official website: http://yxsdz.cn.