免费无遮挡又黄又爽网站无码国产_日韩美女在线成人毛片视频_性欧美日本视频一区在线播放_日韩成人午夜福利免费在线观看_欧洲精品视频无码_一女三男做2爱A片._五月六月婷婷中文字幕在线_观看最新热门影片_国产妇女视频三级99色图_精品人妻伦一二二区久久

免费无遮挡又黄又爽网站无码国产_日韩美女在线成人毛片视频_性欧美日本视频一区在线播放_日韩成人午夜福利免费在线观看_欧洲精品视频无码_一女三男做2爱A片._五月六月婷婷中文字幕在线_观看最新热门影片_国产妇女视频三级99色图_精品人妻伦一二二区久久

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類(lèi)
聯(lián)系我們
濟南航豐實(shí)業(yè)有限公司

電話(huà):15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://yxsdz.cn  

廠(chǎng)址: 德州市禹城市莒鎮產(chǎn)業(yè)園26棟

經(jīng)銷(xiāo)商地址:天橋區建華五金市場(chǎng)東區5-1  

魯ICP備09095923號-1

新聞資訊

當前位置:首頁(yè) / 新聞資訊

鋁合金封閉母線(xiàn)槽安裝對支架間距的要求

  1.組合式鋁合金封閉母線(xiàn)槽安裝技術(shù)要求較高,對建筑結構上的預埋件質(zhì)量、支撐結 構的強度、安裝精度要求也較高。為了保證安裝質(zhì)量,好在施工現場(chǎng)用經(jīng)緯儀在各個(gè)預埋件 上找出統一高度,做好標記,可以有效減小水平安裝誤差。
  1. combined Aluminum Alloy closed busbar installation technical requirements for high building structure of embedded parts quality, supporting structure strength and installation precision is higher. In order to ensure the quality of the installation, the best at the construction site with a theodolite in various embedded parts out of uniform height, mark, can effectively reduce the level of installation error.
  組合式鋁合金封閉母線(xiàn)槽水平安裝 時(shí),插接箱與組合式鋁合金封閉母線(xiàn)槽是結合為一體的,其安裝位置較高,不便于日后的操作 和維護。
  Combined Aluminum Alloy closed busbar horizontal installation, connection box and combined Aluminum Alloy closed busbar is integrated, the installation of a higher position for days after operation and maintenance.
  2.封閉式母線(xiàn)槽安裝時(shí)整體結構應橫平豎直,母線(xiàn)通道水平安裝,兩支架間距≯2500㎜, 垂直安裝間距≯3600㎜;水平安裝時(shí)距地面安裝高度不小于2.2m,吊桿應有調節水平的技術(shù)措施。
濟南電纜橋架廠(chǎng)家
  2. Enclosed Busbar installation structure should be horizontal and vertical, horizontal channel bus installation, two support spacing more than 2500 mm, 3600 mm spacing using vertical installation; when installed horizontally from the ground installation height of not less than 2.2M, technical measures must be taken to adjust the level of the boom.
  3.母線(xiàn)垂直通過(guò)頂板敷設時(shí),應在通過(guò)的底板上采用槽 鋼支撐固定,當封閉式母線(xiàn)跨越建筑物的伸縮縫或沉降縫時(shí),采用適應建筑物結構移動(dòng)的措施, 防止母線(xiàn)連接處水平移動(dòng)造成斷裂,影響母線(xiàn)的 供配電。
  3. bus through vertical roof laying, the floor should be in by using fixed channel support, when the telescopic enclosed bus across the building seam or settlement joint, using adaptive structure mobile measures, prevent the busbar connection level caused by movement of fracture, influence of bus power supply.
  4.垂直敷設時(shí)距地面1.8m以上,安裝支架應與通道側板配鉆孔,采用M6-M8螺栓緊固。母線(xiàn)的 拐彎處以及與插接箱的連接處應加支架。 支架成排安裝時(shí)支架成排安裝時(shí)應排列整齊間距均勻。
  4. the vertical laying is more than 1.8m from the ground. The mounting bracket should be drilled with the channel side plate and fastened with the M6-M8 bolt. The bends of the busbar and the connection to the socket should be added. When the bracket is installed and installed, the bracket should be arranged in uniform spacing when the bracket is installed and installed.
  當母線(xiàn)的終端盒、始端盒懸空時(shí)應采用支架固定,墻體、頂板上的支架必須用兩條膨脹螺栓固 定,膨脹螺栓應加平光墊片和彈簧墊片。
  When the bus terminal box, the box should be used when the end hanging bracket, bracket wall, roof must use two expansion bolt, expansion bolts should be flat and spring washers.
  我們用滿(mǎn)腔的熱情、無(wú)限的激情對待工作和客戶(hù),濟南電纜橋架愿意用勤奮的努力和您一起共鑄美好明天!
  We are filled with enthusiasm and passion towards work and customer, Ji'nan cable tray willing to hard work and you create a better tomorrow!
 
qq
售前咨詢(xún)熱線(xiàn)
15168870138
售后咨詢(xún)熱線(xiàn)
13465410318